Telemetry Tracking
When drilling directional and horizontal wells, telesystems with a hydraulic communication channel are used, transmitting information from the bottom using mud pulses in the drill string. The telesystem provides control of the direction and lithological separation of the geological section of the well during drilling.
The services of preliminary well design and directional drilling using the software package “Engineering calculations of well construction” can reduce the time and cost of drilling, providing high-precision data on the spatial position of the well and the characteristics of the formation to solve complex problems as when performing drilling operations in conventional and in extreme conditions.
Data exchange between the drilling facility and the central office is carried out using satellite Internet and cellular communications. Our team of highly qualified and experienced engineers will help you successfully plan and execute drilling operations with maximum efficiency and minimal time.
To date, our specialists have accompanied the drilling of more than 50 wells, with a depth of up to 4,200 meters, of which 20 are wells with horizontal completion, with a horizontal section length of up to 500 meters.