×
Installation for Automated Calibration of Downhole Flowmeters
(设备/材料)
描述:
Installation for automated calibration of downhole flowmeters
概观:
Appointment:
- calibration and calibration of downhole water flow meters.
Composition:
- software-controlled reproduction of set values of water flow in columns of different diameters in injection and production wells;
- metrological processing of measurement results;
- generation of log files and calibration certificates.
Contents of delivery:
- installation;
- Control block;
- technological computer.
Specifications
| 0.1 ÷ 10 |
| 0.2 ÷ 20 |
| 0.4 ÷ 40 |
| 0.6 ÷ 60 |
| 0.8 ÷ 80 |
| ± (0.01+ 0.01 · Q e ) |
| ± (0.1+ 0.01 · Q e ) |
| 4 ÷ 10 |
| 10 |
| 60 ÷ 150 |
| 1.5 ÷ 2.6 |
| 25 ÷ 42 |
| 10 |
| 2 ÷ 6 |
| (2.2x1.2x2.5) (3x2x3.4) |
| 200 ÷ 300 |
| automatic, manual |
LLC Ural-Geo CMI
地点: Russia / Ufa
主要产品/服务: Development, manufacture, supply to geophysical enterprises and periodic calibration of standards for downhole geophysical equipment
注册: Russia / Ufa