×
名字和姓氏
有效的电子邮件地址。 该地址将用于系统电子邮件和通知。
使用条款
Show terms

By accessing and utilizing our servers, services, websites, or any associated content/postings, you agree (individually and on behalf of a business if applicable) to our Terms of Use (below), which we may update anytime at our discretion. If you do not agree to the Terms of Use (“Terms”), then you are not authorized to use any of our materials for either posting or viewing/search purposes.

More info

2 + 2 =
解答这道简单的数学问题并输入结果。 例如。 对于1 + 3,请输入4。
这个问题被要求找出是否你是一个人或自动发送同样的消息到多个新闻组邮件列表。
添加产品
Product / Equipment

POWER BARGE GAS TURBINE SW251B11/12

(设备/材料)
型号编号: SW251B11/12
状态: New
位置或存放国家: Germany
服务工程支持: Yes
保证: No
价钱: 要求价格
描述:
POWER BARGE FOR SALE OR LEASE. 1 x SW251B11/12. 48 MW. 50/60 hz. Running on condensate fuel. Natural gas, propane or HFO conversion takes around 2-3 months; the power barge can run during these conversions. Less than 30,000 hours operating on condensate fuel. CURRENT LOCATION: AFRICA. Type of construction: Steel hull (non-propelled) General dimensions: Length: 64.36 meters Breadth : 18.28 meters Draft: ~2 meters Gross tonnage: 2,876 tons
概观:
  • 48 MW
  • 50/60 hz
  • FUEL: CONDENSATE FUEL
  • 30,000 operation hours
  • FOR SALE OR LEASE
Power (MW) 48
Fuel Condensate Fuel
Frequency (Hz) 50/60
Operation Time (h) 30000

Siemens

地点: Germany / Bavaria
主要产品/服务: Energy, Building Technology, Industrial Automation, Healthineer