Self-Propelled Exploratory Drilling rig URB-2D2 with Compressor unit AK-12/10, Hydraulic winch LBS-250 with free Discharge and Hydraulic pipe clamp TZG-3-10 on the Chassis of Tractor TLP-4M-034
(设备/材料)
描述:
The drilling rigs of the URB-2D2 series are designed for drilling by rotary method with flushing, blowing, impact-rotary method with a submersible pneumatic hammer and augers of wells of various purposes, including water intake wells.
概观:
Conventional designation | URB-2D2 | |
Mounting base - chassis | Skidding chassis TLP-4M-034 | |
Conventional drilling depth, m | ||
- geophysical wells | ||
with blowing | 30 | |
with flushing | 100 | |
- hydrogeological wells | 150 | |
- structural wells | 300 | |
- augers | 15 | |
Well drilling diameter no more than, mm | ||
- initial hydrogeological wells | 450 | |
- final hydrogeological wells in soft rocks | 294 | |
- final hydrogeological wells in hard rocks | 190 | |
- initial geophysical and structural wells | 190 | |
- final geophysical | 190 | |
- final structural | 118 | |
- augers | 400 | |
Rotator | movable with hydraulic drive | |
- rotation frequency of the drilling tool, (rpm)* | ||
I speed II speed | 70 ±10% 50 ±10% | |
- maximum moment of force, N*m | ||
I speed II speed | 3900 7800 | |
- permissible load on the elevator, kN (kgf) | 63 (6300) | |
- rotator stroke not less than, mm | 5200 | |
Working pressure in the hydraulic system, MPa (kgf/ cm2 ) | 18 (180) | |
Rig lifting speed, m/s | (0 – 1.25) ±10% | |
Length of drill pipe, nominal, m | 4.7 | |
* See table | ||
Hydraulic motor brand | Spindle speed, rpm. | Spindle torque, Nm |
MG112/32M | 280 (140) | 1600 (3200) |
VM4-160 | 140 (100) | 1900 (3800) |
VM4-200 | 110 (80) | 2400 (4800) |
VM4-250 | 90 (60) | 3000 (6000) |
VM4-320 | 70 (50) | 3900 (7800) |
VM4-400 | 60 (40) | 4300 (8700) |
VM4-500 | 40 (25) | 4800 (9600) |
Chassis of the skidding machine TLP-4M-034
- two-seater cabin
- six road wheels
- engine A-01MRSI
- 500mm wide tracks
- pre-heater engine "Teplostar"
- autonomous cabin heater "Planar"
Compressor unit AK-12/10-05 (with installation),
- Manufacturer: ZAO ChKZ, Chelyabinsk
- Performance: 12.0 m3/min/10 atm
- Cardan shaft drive (101 kW, 1555 rpm)
- Without PJD
OOO Promburavto
市场: РФ, СНГ
主要产品/服务: Special equipment, drilling equipment
注册: 456386, Chelyabinsk region, Miass district, Smorodinka village, Centralnaya street, 5A